Position 1
Pre-deployment red-team is the load-bearing safeguard
Catastrophic-risk capabilities (CBRN uplift, autonomous replication) must be identified BEFORE deployment because post-deployment correction is too slow. Pre-deployment red-team + capability-evaluation gating is the only mechanism with the timing-property catastrophic risks require.
Primary sources